SysID | LT000227/204 |
Alt Ref No | Part2/3/20/1/204 |
ArchiveRefNum | LT000227/204 |
Level | File |
Title | Evaluation of the Chiltern Metro |
Description | A study concerning the provisional assessment of the engineering feasibility and costs of a new metro-style train service from Marylebone Station with details of the potential demand, tests undertaken such as for passenger flow, a preliminary economic analysis, approximate costs and economic benefits. |
Date | May 1998-9 Jun 1998 |
Record Creator | Office of David Bayliss, Director of Planning |
Extent | 1 |
Format | booklet(s) |
Language | English |
Related Material | Other records in this series may be relevant to your research but will not have been returned in your search results because the description does not include the search term you used. If you want to browse through a particular series it is possible to do so by accessing the Hierarchy Browser. If you click on the SysID code you will be able to view the Hierarchy Browser for the entire series. Clicking on any of the codes in the browser list will take you directly to the full record view of that individu |
Repository Held By | Transport for London Group Archive |