SysIDLT000227/430
Alt Ref NoIK120
ArchiveRefNumLT000227/430
LevelFile
TitleChannel Tunnel Rail Link Dispersal Impacts Study: Prepared by London Transport and London Underground Limited (LUL) on Behalf of the Department of Transport - Final Report
DescriptionReport concerning a study of the dispersal impacts on London Regional Transport services at King's Cross St. Pancras Station of Channel Tunnel services terminating at the station.
Date8 Dec 1994
Extent1
Formatvolume(s)
LanguageEnglish
Related MaterialOther records in this series may be relevant to your research but will not have been returned in your search results because the description does not include the search term you used. If you want to browse through a particular series it is possible to do so by accessing the “Hierarchy Browser”. If you click on the SysID code you will be able to view the “Hierarchy Browser” for the entire series. Clicking on any of the codes in the browser list will take you directly to the full record view of that individu
Repository Held ByTransport for London Group Archive
    Powered by CalmView© 2008-2024